    Lorem ipsum dolor sit amet, consectetu sit amet, consectetur adipisicingr adipisicing elit. Ab alias aliq

    Monday - Thursday
    Jan - Apr: £xxxx
    May - Sep: £xxxx
    Oct - Dec: £xxxx

    Monday - Thursday
    Jan - Apr: £xxxx
    May - Sep: £xxxx
    Oct - Dec: £xxxx

    Monday - Thursday
    Jan - Apr: £xxxx
    May - Sep: £xxxx
    Oct - Dec: £xxxx

    What next..

    Great to hear you are considering a Lowfield Leisure unit.
    Here are some things you need to know about your next steps with Lowfield Leisure, should you wish to purchase a unit:


    Before you order:
    You will need to fill out a site access questionnaire in order for Lowfield Leisure to provide a full quote for the units. This is because:

    1. Route to the site needs to be reviewed for weight and height restricted roads as well as any sharp bends that could be impassable to a lorry, trailer and lodge.
    2. Access to the site entrance from main roads needs to be reviewed depending on the unit you have chosen.
    3. Moving the unit from the entrance of the site to it’s final siting position needs to be considered to ensure it is clear of obstructions such as gates and barriers. (Foliage may need to be trimmed back as to not cause obstruction into the premises, which could damage the unit.)

    Whittington Lodges at Love2Stay Mid Wales

    Prior to delivery:

    As Lowfield Leisure units are not on a stereotypical chassis, they are much more flexible and can be placed much lower to the ground than traditional leisure units to assist access.

    Sited low to the ground. Access to services via a service pit.

    Sited high enough to allow access underneath the unit.

    Some sites already have a full concrete pad installed on site. Assuming this is level, the unit can be simply lowered straight onto this. There will however need to be a service pit created to connect the services up once the unit has been landed. If you would like the unit higher off the ground, then piers will need to be provided. These piers can come straight off the slab if one is in-situ, alternatively, individual piers can be created to any desired height. A plan for the location of these will be provided depending on the lodge you have chosen.

    Unit located directly onto a concrete base. (Service pit required for connections)

    Unit located onto concrete piers, finishing at ground level. (Service pit required for connections)

    Piers built up off concrete base, minimum 450mm height. (Providing full access to services)

    Piers built up off concrete foundations. Minimum pier height 450mm. (Providing full access to services)

    It is your responsibility to ensure the site is prepared to receive the unit with services ready for connection.

    Your ground-works contractor will need to do this allowing for the minimum support of a pier constructed in concrete or 7.3N/mm² solid-concrete blocks, no greater than 350mm off a level and even surface. An allowance of +/- 20mm will be accommodated for when delivering the unit for final levelling.


    Engineering stipulates foundations should be designed to the prevailing ground conditions of the site, accommodating unfactored loads of 50kN vertical force, 10kN horizontal force and appropriately secured down to withstand an uplift of 15kN.


    Your services will be required to be connected by a competent registered, Plumber & Electrician, and clear access to these services will be required under the unit when building your supporting foundations.

    Incoming Services

    1. Electrics– A 32amp MCB / 6mm armoured electrical cable should be installed up to the indicated point of the drawings and Extended 1200mm to connect internal in with an PVC IP66 box.
    2. Water– 20-25mm MDPE Water Main Pipe – Extended 1200mm to connect internally to the unit stop tap.
    3. Gas– 4no. Propane LPG Gas Bottles & Supporting Slabs and a 4 Way Automatic LPG Gas Changeover Valve with OPSO

    Outgoing Services

    1. Waste– 110mm waste pipes will be required to the location(s) shown on the site layout drawing. Once the unit has been delivered your plumber should connect these using a 4” slip coupler.

    The position of each of these things varies unit to unit – site works drawings can be issued on request.

    If you would like to place an order, please fill in the below form so we can prepare a full quote including siting and delivery for you. Please fill in the form and return it to enquiries@lowfieldleisure.co.uk

    If you have any more queries please don’t hesitate in contacting us today!

    Follow us on Instagram at lowfieldleisure